ISS Ltd supplied and erected all the scaffolding for this large upgrade, we also supplied
all the riggers for the installation of the new ducting, mechanical plant and
the controlled removal of existing plant on the 7th floor. ISS Ltd were
instrumentally involved in the planning and installation of the new eight floor
and all the upgraded plant and ducting.
One
of ISS Ltd's experienced Steel Erection crew erected this 120 tonne building on
time and within the customers steel tolerances. This was a challenging project
due to their being no cross bracing in the building; ISS Ltd used temporary bracing
and guy wires to secure the building during erection.
ISS Ltd
along with TranscarNZ assisted installed the new Turbine at the Genesis Energy Power
Station in Huntly weighing 360 tonne. ISS Ltd were responsible for setting up the lifting
towers and hydraulic jacking systems we were also involved with the placement
of the train rails to roll the turbine into place, ISS Ltd also assisted with the final
placement of this turbine.
Photo's coming soon
ISS Ltd were involved with a large part of this project. ISS Ltd supplied Riggers and Scaffolders for the erection of the steel for the Turbine Hall, ISS Ltd did the majority of the Steel Erection on this site. We also supplied Scaffolding Hire, Dogmen for the various Crane lifts and Supervisors on this site.
Photo's Coming Soon
ISS
Ltd were contracted by D&H Construction Limited to erect all the steel within these
facilities with each facility made up of up to 260 tonne of steel. These
pictures show ISS Ltd lifting a roof section into place at the Spring Hill
Correctional Facility, South of Auckland.