Home
What We Offer
Specialties
Clients and Projects 1
Clients and Projects 2
Clients and Projects 3
How to find us
Employment
Steel Fabrication
ISS Photo Gallery
 







ISS Ltd supplied and erected all the scaffolding for this large upgrade, we also supplied all the riggers for the installation of the new ducting, mechanical plant and the controlled removal of existing plant on the 7th floor.  ISS Ltd were instrumentally involved in the planning and installation of the new eight floor and all the upgraded plant and ducting.











One of ISS Ltd's experienced Steel Erection crew erected this 120 tonne building on time and within the customers steel tolerances. This was a challenging project due to their being no cross bracing in the building; ISS Ltd used temporary bracing and guy wires to secure the building during erection.









ISS Ltd along with TranscarNZ assisted installed the new Turbine at the Genesis Energy Power Station in Huntly weighing 360 tonne. ISS Ltd were responsible for setting up the lifting towers and hydraulic jacking systems we were also involved with the placement of the train rails to roll the turbine into place, ISS Ltd also assisted with the final placement of this turbine.









Photo's coming soon





ISS Ltd were involved with a large part of this project. ISS Ltd supplied Riggers and Scaffolders for the erection of the steel for the Turbine Hall, ISS Ltd did the majority of the Steel Erection on this site. We also supplied Scaffolding Hire, Dogmen for the various Crane lifts and Supervisors on this site.











Photo's Coming Soon



ISS Ltd were contracted by D&H Construction Limited to erect all the steel within these facilities with each facility made up of up to 260 tonne of steel.  These pictures show ISS Ltd lifting a roof section into place at the Spring Hill Correctional Facility, South of Auckland.







 
Top