Rope access puts a technician at a single point on a structure without building a scaffold or booking a crane. At Industrial Site Services the rope access team sits inside the rigging division, so the person on the rope is a rigger first, which is why jobs grow. A call to change a light bulb at Seddon Park ended with the 50 m lighting towers replaced.
We run rope access from Te Rapa in Hamilton and go wherever the job is in New Zealand.
Ropes suit inspection, short repairs and awkward single points. If the job needs a work platform, materials stacked at height, or more than a couple of people, it needs a scaffold, and we'll say so. If the whole structure has to come down or go up, it's a rigging and crane job. We do all three, so we have no reason to push one.
Our rope access technicians hold qualifications ranging from basic to advanced certificates, and many of them have been on ropes and rigging since the day they left school.
A way of getting a technician to a point at height on two ropes, with no scaffold and no crane. It's used for inspection, welding, repair and rigging where a platform isn't needed. At Industrial Site Services the rope access team is part of the rigging division.
Ropes for inspection, short repairs and single awkward points. Scaffold for anything that needs a work platform, materials at height, or more than a couple of people. ISS does both, so ask.
Yes. Seddon Park's lighting towers were repaired by rope access welding before they were replaced. Rust repair, grinding and welding at height are rope access jobs for us.
Rope access rescue systems were part of the Seddon Park job, and confined space rescue was part of the weir gate lift at a hydro station.
Anywhere. The rope access team is based at Te Rapa, Hamilton. The jobs on this page are in Hamilton, at Te Miro near Cambridge, and at a hydro station.
Certificates from basic to advanced, with the rigging tickets to match.
A short note to say thank you for attending the official opening of Te Mahi Hou last week.
Te Mahi Hou has been a significant undertaking for Refining NZ. I’m sure you’ll agree that the opening did justice to four years of hard-work by everyone involved to get the project successfully across the line.
Your continued support for Te Mahi Hou during that time is much appreciated.

G’day Graham
Firstly please pass on my thanks to the ISS team for the support over the weekend. With the amount of hours completed being incident-free was a great achievement. Your team's attitude and enthusiasm was outstanding. These types of companies Pollock Cranes wants to align with going forward.