ISS Rigging has undertaken some of the most complex and challenging projects in New Zealand and around the world. Our experience varies from salvaging containers off the reef-stricken Rena to rebuilding the recovery boiler at the Tasman Mill in Kawerau. Our team of experts have experience in both mechanical and structural steel rigging, and many of them have been honing these skills since the day they left school (yep, ages ago!).
Our riggers handle jobs of any size or difficulty, boasting qualifications ranging from basic to advanced certificates. With extensive experience, including contributions to major projects like the Christchurch rebuild and Auckland’s underground infrastructure program, our team is ready for any challenge. We've earned numerous awards for excellence and carry the largest range of rigging equipment in New Zealand. Our fleet of heavy vehicles, trucks, hi-abs add efficiency and flexibility in terms of our logistical offerings.
Work on ropes rather than cranes has its own page: Rope Access.
Wind turbine erection has its own crews and its own page: Renewables. Work on ropes rather than cranes is on the Rope Access page. We rig, erect and move steel; we aren't a structural engineering consultancy, so a lift that needs an engineer's producer statement gets that from your consultant or one we work alongside.
The crew, the gear, the lift plan, crane hire if the job needs one, transport and supervision. Send us the drawings and the quote will say which of those your job needs.
Yes. At the Tasman mill in Kawerau we rigged out boiler sections of up to 20 tonnes with air winches and a temporary gantry crane, then skated the 120 tonne lower section into place and jacked it onto its foundation. At Danone we built our own hoist and lift shaft to get two 8 tonne blenders through an opening 12.5 m up.
The heaviest single lift on this site is 45 tonnes: three sections of an 80 m flare stack at Channel NZ, lowered together. Off the hook, the 120 tonne Tasman boiler section was skated and jacked rather than lifted. Tell us what yours weighs and where it has to go, and we'll say how we'd move it.
We manage and supply the crane as part of the job. Seddon Park's 50 m lighting towers went in with the biggest road-going hydraulic crane in New Zealand. At Brittomart, where access closed off once the tunnel was built, we designed and built a 2 tonne gantry crane on a 50 m monorail instead.
Yes. The Tasman boiler rebuild ran on 24-hour shifts with shift supervision for the whole job, and OJI Fibre Solutions' mill maintenance manager wrote that the team "responded professionally and quickly to provide resources and transportation outside of normal hours" on the Tasman shut.
Rope access sits inside the rigging division, so the person on the rope is a rigger first. It has its own page: Rope Access.
A short note to say thank you for attending the official opening of Te Mahi Hou last week.
Te Mahi Hou has been a significant undertaking for Refining NZ. I’m sure you’ll agree that the opening did justice to four years of hard-work by everyone involved to get the project successfully across the line.
Your continued support for Te Mahi Hou during that time is much appreciated.

G’day Graham
Firstly please pass on my thanks to the ISS team for the support over the weekend. With the amount of hours completed being incident-free was a great achievement. Your team's attitude and enthusiasm was outstanding. These types of companies Pollock Cranes wants to align with going forward.
