Tainui Bridge
Overview
Industrial Site Services successfully conducted the maintenance repairs for the 300 metre long Tainui Bridge in Huntly, New Zealand. The project was challenging in terms of the terrain and eco-sensitivity of the river flowing under the bridge. The ISS team built unique barge scaffold to work on, along with a rope access team. A job well done in terms of meeting the project deadline. The innovative approach of the ISS team made it possible to complete the project with 3000 man hours and well within the budget.
Scope
- On-site and osite fabrication
- Scaffolding
- Rigging
- Rope access
- Sandblasting
- Painting
- Trffac Management
- Crack injection
- Welding
Highlights
- Completed with only 3318 work hours and zero LTI’s
- Unique barge scaffold designed and built in house by the Industrial Site Services team
- Completed on time and on budget - Industrial Site Services winches were used to move the barges between piers
- Built innovative and unique designing of suspended scaffolding around piers
- The project schedules were managed to keep the bridge traffic disruption to a minimum